Ford, D N (2002) Achieving Multiple Project Objectives through Contingency Management. Journal of Construction Engineering and Management, 128(01), 30–39.

Haas, C and Einstein, H H (2002) Updating the Decision Aids for Tunneling. Journal of Construction Engineering and Management, 128(01), 40–48.

  • Type: Journal Article
  • Keywords: Tunneling; Construction management; Project management; Construction costs; tunnelling; civil engineering; project management; construction industry; structural engineering computing;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2002)128:1(40)
  • Abstract:
    The “Decision Aids for Tunneling” are a procedure and computer code that can be used to assess the effect on construction cost and time of geologic/geotechnical uncertainties and uncertainties in the construction process. Previously, it was only possible to make predictions prior to construction. There is, however, a need for updated predictions while construction is in progress. Such predictions can be used to improve scheduling, resource allocation, financial planning, and so on. This article presents an updating procedure that allows one to refine predictions during construction. Updating not only involves replacing the original prediction with actual data from the excavation, but also includes a learning component using information from the actual excavation to arrive at an improved prediction for the unexcavated part of a tunnel.

Hanna, A S, Camlic, R, Peterson, P A and Nordheim, E V (2002) Quantitative Definition of Projects Impacted by Change Orders. Journal of Construction Engineering and Management, 128(01), 57–64.

Jaselskis, E J, Kurtenbach, J M and Forrest, J (2002) Enhancing Financial Success Among Electrical Contractors. Journal of Construction Engineering and Management, 128(01), 65–75.

Lee, E, Roesler, J, Harvey, J T and Ibbs, C W (2002) Case Study of Urban Concrete Pavement Reconstruction on Interstate 10. Journal of Construction Engineering and Management, 128(01), 49–56.

Love, P E D (2002) Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects. Journal of Construction Engineering and Management, 128(01), 18–29.

McCabe, B, AbouRizk, S and Gavin, J (2002) Time of Sampling Strategies for Asphalt Pavement Quality Assurance. Journal of Construction Engineering and Management, 128(01), 85–89.

Thomas, H R (2002) 2000 Peurifoy Lecture: Construction Practices in Developing Countries. Journal of Construction Engineering and Management, 128(01), 1–7.

Wang, W (2002) SIM-UTILITY: Model for Project Ceiling Price Determination. Journal of Construction Engineering and Management, 128(01), 76–84.

Yates, J K and Lockley, E E (2002) Documenting and Analyzing Construction Failures. Journal of Construction Engineering and Management, 128(01), 8–17.